Drilling & blasting contractor · St. George, Utah
Drilling and blasting for site, utility and quarry work.
Rocking P Blasting is a drill-and-blast subcontractor for general contractors, excavation contractors, developers and aggregate producers across Utah and the western US. Shot design, the blasting permit and explosives are included in every bid.
- Established
- 2011
- Home base
- St. George
- Working
- Western US

What we do
Drilling and blasting, start to finish.
- 01
Construction blasting
Mass rock excavation for subdivisions, commercial pads, roads, tanks and reservoirs.
Learn more - 02
Trench blasting
Rock trench for sewer, water, storm drain and dry utilities, bid by the foot.
Learn more - 03
Quarry & pit blasting
Production shots and new-bench development for aggregate producers and mines.
Learn more - 04
Close-proximity blasting
Controlled shots near homes, buildings and buried utilities, with independent monitoring.
Learn more - 05
Rock drilling & pre-split
Track-drill production drilling and pre-split lines for clean, stable walls.
Learn more - Bidding a project?
Send the plan set.
We'll review the cuts, the access and nearby structures and price the drilling and blasting.
Request a bid
Every shot on the record
Quantities you can check.
Our crews log every hole as it's drilled and every shot as it's loaded and fired in Pop Rocks, the field system we built for our own work. Your field ticket lists the holes, the average depth, the pattern and the yardage, so the number on the invoice is one you can check.
- Drill logs: every hole's location and depth
- Blast reports: loading, timing and seismograph readings
- Field tickets: holes × average depth × burden × spacing ÷ 27
| Hole | Depth |
|---|---|
| H-001 | 14.2 ft |
| H-002 | 15.0 ft |
| H-003 | 14.8 ft |
| H-004 | 14.4 ft |
| … 138 more holes, every one listed | |
- Holes
- 142
- Avg depth
- 14.6 ft
- Pattern
- 8 × 9 ft
142 × 14.6 × 8 × 9 ÷ 27

Why Rocking P
Planned, measured and written down.
Blasting is safe and predictable when it's designed for the rock and for what's next to it. That's how we run every job, from a utility trench to a production bench.
- Straight bids
- What's included, what you provide and how quantity is measured, all on the page before you sign.
- Permits handled
- We pull the city or county blasting permit and coordinate with the municipality before the first hole.
- Independent monitoring
- A third-party firm measures the vibration on our shots, so the readings don't come from us.
- Close quarters
- Small patterns and multiple lifts when homes, buildings or live utilities are close.
How a job runs
From bid to final shot.
- 01
Send the scope
Plan set, quantities, location and schedule. Bid documents and site photos help.
- 02
Site review and bid
We review the cuts, the access and nearby structures, then submit a bid that lists inclusions, exclusions and how quantity is measured.
- 03
Permit and design
We pull the blasting permit and design the pattern, the loading and the timing.
- 04
Drill and shoot
Holes drilled and logged, then loaded and fired in step with your excavation, with monitoring where required.
- 05
Report and ticket
A blast report and a field ticket for every shot, with quantities you can verify hole by hole.
Service area
Based in St. George. Working across the West.
Most of our work is in Utah, and our crews travel for the right project, from Reno to Rawlins and from the Arizona Strip to eastern Idaho. Mobilization is quoted in every bid.
- Utah41 towns
- Nevada3 towns
- Arizona2 towns
- Idaho5 towns
- Wyoming2 towns
Where do you work?
We're based in St. George, Utah. Most of our work is in Utah, and we take projects across the western US, including Nevada, Arizona, Idaho and Wyoming.
What's included in a Rocking P bid?
Shot design, layout and execution, the city or county blasting permit, all explosives, labor and coordination with the municipality. Most bids also include third-party seismic monitoring. Each bid lists what the site contractor provides, too.
How do you price drilling and blasting?
Mass rock by the cubic yard, trench by the lineal foot and pre-split by the square foot of face, plus mobilization. Yardage comes from the pattern: holes × average depth × burden × spacing ÷ 27.
What size projects do you take?
Everything from a single building pad or utility run to multi-phase subdivisions, highway work and quarry production. Smaller scopes are usually priced as a lump sum.
What documentation do you provide?
A blast report and a field ticket for every shot. The ticket lists every hole, the average depth, the pattern and the yardage, so quantities are easy to verify.
Do you work on public or federal projects?
Yes. We bid public and federal work, including jobs with certified payroll and Davis-Bacon wages.
Put Rocking P on your bid list.
Send the plan set, quantities and schedule for your next project. We'll review the scope and the site and get you a drill-and-blast price.